Sunlit empty room with light wood floors, staircase, neutral walls, and large archway in a modern home interior.

Hardwood Floor Refinishing in Atlanta, GA

Bring Worn Hardwood Back to Life.

Sanded back to bare wood, stained to a color you approve on your own floor in your own light, and sealed with a finish built for a house people actually live in. If boards are damaged rather than just tired, board repair comes first. Dust stays contained. Most homes are done in four to six days.

Get a free estimate

500+ Atlanta floors finished

Licensed, bonded & insured

Dust containment on every sand

Showroom in Alpharetta

What Refinishing Actually Involves

The short answers

4–6 days

Timeline

1,200-1,800 sq ft main level, stain included

$3.50–$6.50

Cost

per sq ft, sand to bare wood plus three coats

24 hours

Walk on it

socks only after the final coat

5–7 days

Furniture back

area rugs at three weeks, not before

Usually yes

Can you stay?

we phase rooms and seal the work zone

Three Jobs Get Called Refinishing. Only One Is Right

Start here

Most quotes people get are for a full sand because a full sand is the bigger invoice. Here is how to tell which one your floor needs before anyone comes out.

  • Lightest

    Screen & recoat

    We abrade the existing finish and lay one fresh coat over the top. No sanding into the wood, no stain change, no dust to speak of.

    On site

    1 day

    Cost

    $1.75–$3.00 / sq ft

    Color change

    No

    Removes scratches

    Surface only

    Right when: the finish looks dull or lightly scuffed but water still beads on it.

  • Most homes · what we do most

    Full sand & refinish

    Three grits down to raw timber, stain of your choice, then three coats of sealer. This is the only route to a new color or to taking out damage that reaches the wood.

    On site

    4–6 days

    Cost

    $3.50–$6.50 / sq ft

    Color change

    Yes, any stain

    Removes scratches

    Yes, to the wood

    Right when: you can feel scratches with a fingernail, there are gray or worn traffic paths, or you want a different color.

  • Repair first

    Board repair, then refinish

    Damaged boards cut out and woven in with matched stock, then the whole run sanded and finished together so the repair vanishes into the floor.

    On site

    6–9 days

    Cost

    Refinish + from $475

    Color change

    Yes

    Removes scratches

    Yes, plus damage

    Right when: there is water damage, cupping, pet staining that has gone through, or boards that move underfoot.

  • 3mm

    Engineered floors: it depends on the wear layer.

    Engineered hardwood can be refinished if the veneer above the top ply is thick enough. At 3mm or more we can usually take a full sand. Under 2mm we cannot, and anyone who says otherwise is going to sand through your floor. We measure at a threshold or a vent cut before we quote, never by guessing at the brand.

Dust Containment Comes Standard on Every Sand

Included, not an upsell

Our sanders are vacuum-fed straight to a sealed unit outside. The work zone runs under negative pressure with HVAC returns taped off, so the fine dust from ninety years of old finish does not end up in your vents, your closets and your kid's room for the next two months.

Red Oak or White Oak? The Same Stain Looks Different on Each

Color & sheen

Nearly every Atlanta home built before about 2005 has red oak, and nearly every new build has white oak. Red oak carries a pink undertone and open grain; white oak is olive-brown and tighter. Pick a DuraSeal color below and see both at once: the grays and the very light colors are where the gap is widest, and where people are most often surprised on sanding day.

Red oak White oak

DuraSeal Provincial · Satin

Compare on

Same can of stain, two species, side by side. Red oak takes it warmer and keeps its grain lines visible; white oak takes it cooler and flatter. This is the comparison most people want before they choose.

DuraSeal stain
Sheen

The most-requested mid brown in metro Atlanta, and it works on both species. Slightly redder on red oak, slightly olive on white oak.

Bring samples to my house

Recent Refinishing Jobs Across Metro Atlanta

Refinished by TriArt

What the Week Actually Looks Like

Day by day

  1. Walkthrough and written price

    Before day one

    We check the species, the wear layer, how many times it has been sanded before, and whether anything under the finish needs repair. You get a number before we leave.

  2. Containment goes up

    Day 1, morning

    Zippered barriers at the work-zone thresholds, HVAC returns sealed, negative air running. Furniture out or blocked and wrapped.

  3. Sanding, three grits

    Days 1–2

    Coarse to fine, drum and edger, then a buff to knock down any swirl. Any board repairs happen here, before stain touches anything.

  4. Stain samples on your floor

    Day 2 or 3

    Two or three candidates laid on the sanded floor in the room they will live in. If stair treads are in scope they are sampled in the same batch. You look at them in morning light and evening light before we commit.

  5. Stain, then three coats

    Days 3–5

    Stain, cure, seal, abrade between coats, seal again. Ventilation stays on the whole time and we work the rooms in sequence so you keep a path through the house.

  6. Cure and final walk

    Day 6 onward

    Socks at 24 hours. Furniture back at 48 to 72 hours, felt pads on everything. Area rugs at three weeks, once the finish has fully hardened. We walk it with you and leave the care sheet.

Hardwood Refinishing Questions from Atlanta Homeowners

Refinishing questions

How many times can a hardwood floor be refinished?

Solid 3/4-inch hardwood has roughly 6-8mm of wood above the tongue, which is four to six full sands over the life of the floor. We check how much is left by measuring at a vent cut or a threshold, so you know where your floor stands before you spend anything.

What do we do with the furniture?

In most cases we move it. Standard furniture gets shifted room to room as we phase the work, or out to the garage and back once the floor is done. Tell us at the estimate visit what is in the rooms and we will tell you what is included. The things we ask you to handle are the ones nobody else should touch: pianos, gun safes, aquariums, and anything with sentimental value you would rather carry yourself.

Do we have to move out?

Most families stay. We seal the work zone, run negative air and phase the rooms so there is always a path through the house. The exception is a small single-level home where the whole floor plan is the work zone, then two or three nights elsewhere makes life easier.

Water-based or oil-based finish?

We use water-based on most homes: it cures faster, smells far less, and modern two-component formulas are harder than oil. Oil-based still has a place if you want that amber warmth on old heart pine or red oak. We will show you both on your floor.

Can you match the new work to floors in the rest of the house?

Usually, and it is worth being honest about the limits. Same species and same stain gets very close, but a floor that has aged forty years under UV has a color no fresh stain reproduces exactly. We sample against the existing floor and tell you before you commit whether it will read as matched or as adjacent.

What does it cost to refinish hardwood floors in Atlanta?

Between $3.00 and $4.00 per square foot for a full sand and three coats. Where you land depends on square footage, whether stairs are included, how much repair work turns up under the old finish, and whether the floor needs an extra pass to pull out old adhesive. Our full cost guide breaks the ranges down room by room.

Does Georgia humidity affect a newly refinished floor?

It affects the cure more than the finish. Water-based finishes cure slower in high humidity, which is why we build an extra day into summer schedules rather than rushing furniture back. Once cured, seasonal movement shows as small gaps in winter and closes again by June. That is normal on solid wood and not a defect.

Are you licensed in Georgia?

We hold Georgia general contractor license RBCO008240. On a floor job that matters more than it sounds: when a sand uncovers a soft subfloor or water damage that reached the framing, we carry the work through instead of stopping at the flooring.

Send a photo of the floor. We will tell you what it needs.

Free estimate

Two steps, no deposit, no sales visit. Most days, we reply within the hour, and if a recoat will do the job, we will say so rather than sell you a full sand.